VELTIN 18. 5. 2022 Share article: Related news 5/2021 The concrete pour of the walls and ceilings on the first underground floor and the first two above-ground floors is underway. The most intense work is on the monolithic structures and insulation against vibrations caused by trams. 1. 5. 2021 Read more 3/22 The monolithic structure was completed right before the start of spring. Thanks to the intensive work on floors 1 to 5, which have previously been winterized, plasterboard walls, HVAC wiring, plastering, and cast floors are now finished. Preparatory work is also under way on the building’s interior. 1. 3. 2022 Read more 10/2021 The construction of the residential bridge connecting the two wings of the building at the point in which they turn away from each other has been ongoing for the past few weeks. This is a major challenge in terms of structural engineering, but will allow apartments with truly unique interiors to be created. 11. 10. 2021 Read more
5/2021 The concrete pour of the walls and ceilings on the first underground floor and the first two above-ground floors is underway. The most intense work is on the monolithic structures and insulation against vibrations caused by trams. 1. 5. 2021 Read more
3/22 The monolithic structure was completed right before the start of spring. Thanks to the intensive work on floors 1 to 5, which have previously been winterized, plasterboard walls, HVAC wiring, plastering, and cast floors are now finished. Preparatory work is also under way on the building’s interior. 1. 3. 2022 Read more
10/2021 The construction of the residential bridge connecting the two wings of the building at the point in which they turn away from each other has been ongoing for the past few weeks. This is a major challenge in terms of structural engineering, but will allow apartments with truly unique interiors to be created. 11. 10. 2021 Read more